Exterior Facade Work in Progress

Exterior repair and finishing carried out in sequence across an elevation.

Category
Exterior Painting
Location
New York City
Property
Residential property

Project overview

Exterior work carried out across a full elevation, with repair completed before any finish was applied.

The existing problem

The previous finish had been applied over surfaces that were never properly prepared, so it was lifting in sheets in some areas and holding firm in others. That mix is harder to deal with than a uniform failure.

Work completed

  • Elevation surveyed and the existing finish tested for adhesion
  • Loose and failed material removed
  • Cracks and damaged areas made good
  • Substrate primed and sealed appropriately
  • Finish applied in the specified coats
  • Surroundings protected throughout and cleaned at completion

The result

A finish bonded to a prepared surface, which is the only thing that decides how long an exterior coating lasts.