Skip to content
Waystar Enterprises Inc. +1240-202-8853 8851 20th Avenue, Brooklyn, NY 11214

Renovation and Construction

Apartment Renovations

Renovating within a building, where the neighbours, the board and the building rules shape the programme.

What apartment Renovations covers

Apartment renovation happens inside a larger building, so it is governed by building rules, board approvals, working hours and shared access as much as by the work itself. Getting the approvals and the logistics right is usually the difference between a smooth job and a stalled one.

Apartment renovation happens inside a larger building, so it is governed by building rules, board approvals, working hours and shared access as much as by the work itself. Getting the approvals and the logistics right is usually the difference between a smooth job and a stalled one.

Renovating within a building, where the neighbours, the board and the building rules shape the programme.

Waystar carries out this work on residential and commercial property in Brooklyn and across New York City. Every project starts with a look at the building, and the scope, the materials and the figures are written down before anything begins.

When might you need it?

These are the signs owners usually notice first.

  • Board or management approval required before anything starts
  • Restricted working hours set by the building
  • One elevator serving every resident and every delivery
  • Neighbours directly above, below and either side
  • Wet areas that must not leak into the apartment below

What the work involves

  • Review of building rules and alteration requirements
  • Documentation prepared for board or management submission
  • Protection for lobbies, corridors and elevators
  • Delivery and removal scheduled to the building hours
  • Waterproofing detailed in every wet area
  • Common areas cleaned and reinstated at completion

How the process works

01

Read the building rules first

Alteration agreements and working hours shape the programme more than the design does.

02

Prepare the submission

Documentation for the board or managing agent gets assembled before work is scheduled.

03

Protect the shared areas

Lobbies, corridors and the elevator are protected before the first delivery.

04

Build to the building hours

Noisy work is scheduled inside the permitted window.

05

Reinstate and hand over

Common areas are cleaned and the apartment walked with you.

What you get

  • Building requirements handled rather than discovered late
  • Neighbours and management kept informed through the work
  • Wet areas detailed properly for a building with occupied units below

What affects the scope

  • Building alteration requirements and approval timescales
  • Permitted working hours and days
  • Elevator access and delivery restrictions
  • Whether plumbing or structural changes need extra approval

This is a preliminary planning range, not a quote. A property visit is required before any price is confirmed.

Frequently asked questions

How long does board approval take?

It varies by building and it is outside our control. Preparing a complete submission first time is what avoids losing weeks to resubmissions.

Can noisy work be done at weekends?

Only if your building permits it, and many do not. The programme is built to the hours your building actually allows.

What about the apartment below?

Waterproofing in wet areas is detailed and tested before finishes go on. It is the single most important detail in an apartment renovation.

Services often needed alongside this

This service is part of Renovation and Construction.

Your property deserves a solid plan

Let us take a closer look.

Request a free estimate